Hempstead Facility

  • 150,000 sq ft total space
    • 98,000 sq ft shop
    • 24,000 sq ft clean room (alloy welding) (New)
    • 24,000 sq ft CS welding room (New)
    • 3,000 sq ft climate-controlled hydraulics lab
    • 1,000 Sq Ft climate-controlled electronics lab
  • 110,000 sq ft exterior concrete yard
  • 15-ton overhead crane (7 Ea)
  • 40-ton overhead crane (5 Ea), (single lift cap. 80 Ton)
  • 60’ high bay (3 each)
  • Fully equipped machine shop
  • Fully equipped HPU & hydraulic test area
  • Extensive fabrication facilities (CS / SS)
  • Office provided for customer project staff
  • Easy drive-thru access for large items
  • 30,000 sq ft shop space (Quayside)
  • 2 – 40-ton bridge cranes bridged for 80-ton lift capacity
  • 60’ high bay
  • Office provided for customer project staff
  • Easy drive-thru access for large items
  • 21,000 sq ft of shop area
  • Full cylinder repair facility
  • 5-ton overhead cranes (2 ea)
  • Full equipped machine shop
  • Offices for staff and customer conferences
  • Climate-controlled elastomer storage warehouse

Logan Industries services

Alloy Heat Exchangers & Pressure Vessel Products

API Products

BOP repair

Cylinders

Mission Specific & Mission Critical

Repairs

Winches, Reelers, Spoolers & A Frames

Standards / Certificates

Logan Industries team

The Logan Industries team consists of highly experienced professionals.

This team has been working together for the better part of a decade and has been proven to consistently deliver results.

Shayne Babich
CEO

Kim LaFon
CFO

Skip Waters
COO

Dean Carey
Technical Director

Greg Soape
QHSE Director

Aaron Holley
IT Director